Register
Product Overview
Overview
Production and operations enhanced through improved hydrodynamics and advanced downhole gas separation techniques for a wide range of artificial lift types.
Business Model
Contact vendor for more information
Technology Innovations
- Customization: Through several generations of tool designs and a multitude of basins tested, EM UPS has learned how to customize tools for specific wells and to utilize enhanced Nodal Analysis and CFD to predictably optimize flow regimes.
- Simplicity: The tools are simple and robust, allowing for easy operation and high reliability.
- Flexibility: The UPS system can be used on a wide range of artificial lift types, including rod lift, ESP, Gas lift, and Plunger lift and slightly altered from one state to another to easily accommodate lift-to-lift conversions.
- Ease of installation: Simply attaches to bottom of lift system, requiring no special tools or servicing equipment and is conveyed on the tubing string. Full staff of well-trained and qualified Field Engineers available to make install a breeze and ensure all is executed 100% as designed for a trouble-free start-up and operation.
Applications
- Improved operation of artificial lift: Improves operation of artificial lift, particularly in horizontal wells and in depleted wells where critical velocities are not maintained.
- Deliquification: By controlling velocities and flow regimes, can deliquefy lateral and curve of the well, improving drawdown and inflow rates
- Reliability: By separating gas and creating consistent and easier downhole environment, find a reduction in failures from gas lock and slugging
- Production: By avoiding gas lock and improving pressure profile, sustained production benefits can be achieved