Have You Created A Free Account?

You are currently trying to access content without an account, please create an account or log in to view more.

Once you’ve created your account, you’ll have access to content via your Company’s membership. You can also request a 21-day Free Trial to try everything that Connect has to offer if your company is not currently a member.

Log In Create Free Account
Have You Created A Free Account?

You are currently trying to access content without an account, please create an account or log in to view more.

Once you’ve created your account, you’ll have access to content via your Company’s membership. You can also request a 21-day Free Trial to try everything that Connect has to offer if your company is not currently a member.

Log In Create Free Account
Home
Events
Research
Innovators
Log In
Echometer UPS
Darcy Presenter

Echometer has developed the UPS (Ultimate Production System) for deployment in horizontal artificial lift wells. The system is both a gas separator and a tool to assure critical velocity and reduce gas slugging.

Published July 16, 2020 • Updated September 23, 2020
Oil & Gas
Production
Insights
Details
Materials

Product Overview

Overview

Production and operations enhanced through improved hydrodynamics and advanced downhole gas separation techniques for a wide range of artificial lift types.

Business Model

Contact vendor for more information

Technology Innovations
  • Customization: Through several generations of tool designs and a multitude of basins tested, EM UPS has learned how to customize tools for specific wells and to utilize enhanced Nodal Analysis and CFD to predictably optimize flow regimes.
  • Simplicity: The tools are simple and robust, allowing for easy operation and high reliability.
  • Flexibility: The UPS system can be used on a wide range of artificial lift types, including rod lift, ESP, Gas lift, and Plunger lift and slightly altered from one state to another to easily accommodate lift-to-lift conversions.
  • Ease of installation: Simply attaches to bottom of lift system, requiring no special tools or servicing equipment and is conveyed on the tubing string. Full staff of well-trained and qualified Field Engineers available to make install a breeze and ensure all is executed 100% as designed for a trouble-free start-up and operation.
Applications
  • Improved operation of artificial lift: Improves operation of artificial lift, particularly in horizontal wells and in depleted wells where critical velocities are not maintained.
  • Deliquification: By controlling velocities and flow regimes, can deliquefy lateral and curve of the well, improving drawdown and inflow rates
  • Reliability: By separating gas and creating consistent and easier downhole environment, find a reduction in failures from gas lock and slugging
  • Production: By avoiding gas lock and improving pressure profile, sustained production benefits can be achieved
Register
Join your peers
Stay up to date on the latest technology trends in your sector.
Sign Up
Events

Production Optimization Forum

Jun 19th 2019

Production Optimization Forum

May 30th 2019

Production Optimization Forum

May 15th 2019

© Copyright 2025 Darcy Partners, LLC | All Rights Reserved | Terms of Use | Privacy Policy | Team | Careers | Support