Have You Created A Free Account?

You are currently trying to access content without an account, please create an account or log in to view more.

Once you’ve created your account, you’ll have access to content via your Company’s membership. You can also request a 21-day Free Trial to try everything that Connect has to offer if your company is not currently a member.

Log In Create Free Account
Have You Created A Free Account?

You are currently trying to access content without an account, please create an account or log in to view more.

Once you’ve created your account, you’ll have access to content via your Company’s membership. You can also request a 21-day Free Trial to try everything that Connect has to offer if your company is not currently a member.

Log In Create Free Account
Home
Events
Research
Innovators
Log In
Advanced Rail Energy Storage

Advanced Rail Energy Storage develops, tests,and patents rail-based, gravity-powered energy storage technologies.Their technologies use no fossil fuel or water, produce zero emissions or hazardous waste, and have a 40+ year service life with no degradation or thermal runaway.

Published November 24, 2020 • Updated December 27, 2022
Advanced Rail Energy Storage
Industrial Decarbonization
Power & Utilities
Electrification & Efficiency
Renewables & Energy Storage
Insights
Details
Materials

Product Overview

Overview

Ares Power is developing a kinetic energy storage system for long duration applications. The company is currently constructing its first project on a pit mine in Nevada with a power capacity of 50 MW.

The company's differentiated technology provides a long duration storage systems with a claimed lifetime of 40 years, which would be industry leading.

Ares Power offers the Gravity Line, a system of weighted rail cars that are towed up a hill of at least 200 feet to act as energy storage and whose gravitational potential energy is used for power generation. Systems are composed of 5 MW tracks, with each car having a fixed motor to generate electricity. Installations can be scaled up to GW-level capacity by the addition of more tracks. Storage duration can be from 15 minutes to 10 hours with response time of 3 seconds.

ARES is building a demonstration scale project (TRL 6-7). They have a 1MW project in California for a private land owner.

Business Model

System developer

Technology Innovations
  • Chain drive chain drives have higher reliability than cable driven systems
  • Scalability system can be sized up by the addition of more rails or cars
Applications
  • Renewable energy shifting store energy generated from renewable systems at times of excess supply for use during times of peak demand, on the order of days
  • Grid balancing use thermal storage as an additional load or generator on the grid to balance supply and demand while 3 second response time is useful for frequency response
Register
Join your peers
Stay up to date on the latest technology trends in your sector.
Sign Up

© Copyright 2025 Darcy Partners, LLC | All Rights Reserved | Terms of Use | Privacy Policy | Team | Careers | Support