Register
Stasis offers an MPD solution with both on- and offshore applications. The company produces single and dual electric driven choke solutions that can be rapidly commissioned and allow for automated control.
Published September 7, 2020
•
Updated February 13, 2025
Oil & Gas
Drilling
Product Overview
Overview
Stasis offers an MPD solution with both on- and offshore applications. The company produces single and dual electric driven choke solutions which are trailer mounted and can be installed and commissioned in ~12 hrs. Additionally, the equipment, when integrated with its proprietary I-IMPACT control system, allows for automated control of SPP or annualar pressure, kick/loss detection, and auto connection settings. The data can be monitored both in real-time on the rig floor or used to more accurately determine pore/fracture pressures in the formation which can be used to optimize well-to-well programs. Stasis additionally offers Rotating Control Devices (RCD) for rental operations with and without MPD services.
Business Model
Dayrate or sale
Technology Innovations
Reduction in overall footprint and design of MPD equipment for job specific applications, 2nd Gen Stasis Manifolds are a 65% reduction in footprint from current industry standards
Integrated trailer mounted design for faster and more cost efficient deployment of MPD packages
25 ft trailer with Dual Choke manifold, PLC control cabinet, and Coriolis flow meter incorporated
Can be delivered by a 1 ton hotshot, no need for a forklift or crane to offload or spot equipment
Reduced HSE exposure due to limitation of lifting and manual handling during installation
Electric chokes that produce precise pressure control and quick response times – Reliable in extreme weather applications and eliminates the need for hydraulics or back pressure pumps/diverters.
Tiered MPD services
Single electric driven choke with set point controls for low tier applications
Dual electric driven chokes with Coriolis flow meter and more advanced control system with more advanced automated features for mid tier MPD well needs
Dual electric driven chokes with high tier fully automated control system (with optional remote login) ran with real time hydraulics.
Applications
Stasis provides a small footprint modern MPD solution which is inter-operable with most drilling contractor configurations.
Managed Pressure Drilling:
- Used in conventional and unconventional operations in all major North American basins as well as international and offshore applications
- Improved ROP
- Wellbore stability control in difficult or heterogenous formations
Managed Pressure Cementing:
- Newer application of the technology which has been used to ensure that the cement is fully ported through the wellbore